LEI was commissioned by Laguna AAA Water Company to design and construct pumping stations and steel-bolted reservoirs that would help improve water supply and service coverage of Laguna Water in the Laguna and Tagaytay areas.
Client:
Manila Water Company
Date of Completion:
January 2020
Specific Scope:
Construction of Pumping Station (PS) that has a capacity of 15MLD (3 x 5MLD) which is connected to the Reservoir.
Construction of Steel Bolted Reservoir that has a capacity of 20 MLD.
Pipelaying of pipe with sizes ranging from 100 mm to 1000 mm Ø with a total distance of 7.4 km.
Microtunneling of 1000 mm Ø Pipe with a distance of 90 lm.